Start with a reliable shipment list
Before assigning work, check that each shipment has enough information for dispatch: a usable delivery location, the relevant reference and any operational instructions your team needs. A planning screen cannot resolve missing customer information on its own.
Keep late additions visible. If a shipment arrives after the day’s plan is agreed, decide who can approve the change and who must be informed. This is especially useful when warehouse loading and driver preparation happen at different times.
Build runs around real constraints
Use Spaces scheduling and run management to organise shipments and assignments. Review the proposed work against vehicle availability, driver arrangements and known customer requirements. Describe this as route planning; do not assume that the system automatically optimises every route or checks every operating constraint.
A hypothetical extra delivery may look close on a map but still conflict with a receiving window or require a different vehicle. Give dispatchers a clear way to raise these conflicts before departure.
- Confirm the vehicle and driver assignment.
- Check the delivery sequence and location details.
- Resolve missing documents and special instructions.
Make changes understandable
When the plan changes, communicate the affected run and the specific change. “Use the latest schedule” is less helpful than identifying which shipment moved and why. Confirm that the people carrying out the work have the information they need.
The driver app provides assigned-run workflows. Include a check of access and the assigned work in your departure routine; do not assume every driver has seen an update simply because dispatch has saved it.
Close the day with an exception handover
Review unfinished shipments, unresolved document issues and runs that need follow-up. Assign an owner and next action to each issue. A brief handover prevents the next shift from starting with a fresh investigation of the same problem.
- Keep the shipment or run reference in every handover item.
- Distinguish confirmed facts from questions still being investigated.
- Use recurring exceptions to improve tomorrow’s preparation.


